Power cables
Baltic Sea
Burial check on a Baltic power cable
A depth-of-burial survey along an interconnector, flown from shore without a survey vessel.
CLIENT
Baltlink Grid
LOCATION
Baltic Sea
DEPTH
46 m
DURATION
3 days
COVERAGE
118 km
YEAR
2025
01
The challenge
Anchor strikes are the main risk to subsea power cables. The grid operator needed to know where the cable had lost its burial cover along 118 km of busy shipping lane.
02
How we flew it
K6 carried a cable tracker alongside the multibeam and flew the route in three legs, surfacing between them to report.
03
What we found
The survey found 2.1 km of cable with less than 0.5 m cover, in four sections, all close to an anchorage. Re-burial was scheduled for the next season.
118 km
Cable surveyed
2.1 km
Low cover found
3 days
Duration

We finally know where the cable is exposed, not where we think it might be.
Asset integrity manager, Baltlink Grid
— MORE PROGRAMMES
More surveys without a ship.
Oil & gas
Norwegian Sea
41 km of export pipeline in a single dive
Line 7 needed a full integrity survey before winter. One K6 flew it end to end and found the free span a ship survey had missed.
19 h
Vehicle time
0
Vessel days

Offshore wind
North Sea
Sixty monopiles in six days
A scour campaign across a 1.2 GW wind farm, run from a single CTV while turbines kept generating.
60
Foundations
6 days
Campaign

Power cables
Baltic Sea
Burial check on a Baltic power cable
A depth-of-burial survey along an interconnector, flown from shore without a survey vessel.
118 km
Cable surveyed
2.1 km
Low cover found

NEXT DIVE
Plan your first survey without booking a ship.
Send the site, the depth and what you need to see. A survey planner replies within one working day with a lane plan and a fixed price.