Offshore wind

North Sea

Sixty monopiles in six days

A scour campaign across a 1.2 GW wind farm, run from a single CTV while turbines kept generating.

CLIENT

Brightwater Offshore Wind

LOCATION

North Sea

DEPTH

28 m

DURATION

6 days

COVERAGE

60 foundations

YEAR

2026

01

The challenge

Scour protection around monopiles has to be checked after every big storm season. Survey vessels struggle inside an operating array, and the owner wanted every foundation checked before the insurance renewal.

02

How we flew it

Two K6 worked from one crew-transfer vessel. Each vehicle flew a spiral around a monopile, mapped the rock armour at 5 cm and moved to the next turbine on its own.

Tidewire graded every foundation against the design scour depth.

03

What we found

All 60 foundations were surveyed in six days with no turbine shutdowns. Four needed remedial rock placement; the rest were cleared for another year.

60

Foundations

6 days

Campaign

4

Flagged for repair

The turbines never stopped. That alone paid for the campaign.

Asset manager, Brightwater Offshore Wind

NEXT DIVE

Plan your first survey without booking a ship.

Send the site, the depth and what you need to see. A survey planner replies within one working day with a lane plan and a fixed price.

LIVE14 VEHICLES AT SEA · 3 DOCKED · 41,208 KM FLOWN THIS YEAR

Create a free website with Framer, the website builder loved by startups, designers and agencies.