MISSIONS
SECTORS
Pick the job. The vehicle stays the same.
Swap the payload and the mission plan, not the vehicle. The same K6 inspects pipelines on Monday and maps wind-farm scour on Friday.

Pipeline inspection
Fly 40 km of export line in a single dive. K6 tracks the pipe, measures burial depth and flags every free span longer than 2 m.
40 km per dive
Scour surveys
Map the rock armour around each monopile and see where the current has dug in, turbine by turbine, without a vessel on site.
60 foundations a week
Seep monitoring
Revisit the same methane seeps every month and log plume height, flow and sediment change against a fixed baseline.
±5 cm repeatability
Debris and lost cargo
Search a box of seabed lane by lane, classify contacts on board and send back positions the recovery crew can trust.
12 km² per dayHOW IT WORKS
From first call to first report in nine days.
- DAY 001Scope call
Send the site, the asset list and what you need to see. A survey planner replies with a lane plan.
- DAY 1–302Mission plan
We model currents and seabed, pick the payload and agree deliverables and a fixed price.
- DAY 503Launch
K6 launches from the quay or your dock and flies to site. You watch it live in Tidewire.
- DAY 5–804Survey
The vehicle flies the lanes, re-flies anything it is unsure of and surfaces to report.
- DAY 905Report
Grids, mosaics and the event list land in your inbox, compared with your last survey.
IMAGING
At 1,240 metres the camera sees blue. The report shows rust.
Water eats red light within metres. K6 lights the scene itself, then corrects every frame on board using the measured distance to the seabed, so inspectors read coating damage in true colour.
- 01Distance-aware colour model
- 023 s per frame on the vehicle
- 03Stereo depth for every pixel


DELIVERABLES
What lands in your inbox after a dive.

| ID | Event | Size | Severity | Position |
|---|---|---|---|---|
| E-041 | Free span | 6.4 m × 0.9 m | High | KP 12.310 |
| E-042 | Gas seep | Plume 11 m | High | KP 12.884 |
| E-043 | Debris | Container 6 m | Medium | KP 13.052 |
| E-044 | Coating damage | 0.3 m² | Medium | KP 13.410 |
| E-045 | Burial < 0.5 m | 38 m length | Low | KP 14.002 |
— PROOF
Missions we flew this year.
Oil & gas
Norwegian Sea
41 km of export pipeline in a single dive
Line 7 needed a full integrity survey before winter. One K6 flew it end to end and found the free span a ship survey had missed.
19 h
Vehicle time
0
Vessel days

Offshore wind
North Sea
Sixty monopiles in six days
A scour campaign across a 1.2 GW wind farm, run from a single CTV while turbines kept generating.
60
Foundations
6 days
Campaign

Power cables
Baltic Sea
Burial check on a Baltic power cable
A depth-of-burial survey along an interconnector, flown from shore without a survey vessel.
118 km
Cable surveyed
2.1 km
Low cover found

NEXT DIVE
Plan your first survey without booking a ship.
Send the site, the depth and what you need to see. A survey planner replies within one working day with a lane plan and a fixed price.