Oil & gas
Gulf of Mexico
Tieback route survey in deep water
A pre-lay route survey for a subsea tieback, with geohazards mapped before the pipe was ordered.
CLIENT
Halcrest Energy
LOCATION
Gulf of Mexico
DEPTH
1,850 m
DURATION
4 days
COVERAGE
26 km corridor
YEAR
2026
01
The challenge
A new tieback needed a route across a slope with known faults and seeps. The engineering team wanted the geohazards mapped before committing to a route and a pipe order.
02
How we flew it
Two K6 flew parallel corridors in deep water, mapping bathymetry, side-scan and sub-bottom data in one pass.
03
What we found
The survey moved the route 400 m east to avoid an active fault scarp and cut 1.8 km from the planned length.
26 km
Corridor mapped
1.8 km
Shorter route
400 m
Route shift

We changed the route before we ordered the pipe, which is the only cheap time to do it.
Subsea engineering manager, Halcrest Energy
— MORE PROGRAMMES
More surveys without a ship.
Oil & gas
Norwegian Sea
41 km of export pipeline in a single dive
Line 7 needed a full integrity survey before winter. One K6 flew it end to end and found the free span a ship survey had missed.
19 h
Vehicle time
0
Vessel days

Offshore wind
North Sea
Sixty monopiles in six days
A scour campaign across a 1.2 GW wind farm, run from a single CTV while turbines kept generating.
60
Foundations
6 days
Campaign

Power cables
Baltic Sea
Burial check on a Baltic power cable
A depth-of-burial survey along an interconnector, flown from shore without a survey vessel.
118 km
Cable surveyed
2.1 km
Low cover found

NEXT DIVE
Plan your first survey without booking a ship.
Send the site, the depth and what you need to see. A survey planner replies within one working day with a lane plan and a fixed price.