The challenge

A new tieback needed a route across a slope with known faults and seeps. The engineering team wanted the geohazards mapped before committing to a route and a pipe order.

02

How we flew it

Two K6 flew parallel corridors in deep water, mapping bathymetry, side-scan and sub-bottom data in one pass.

03

What we found

The survey moved the route 400 m east to avoid an active fault scarp and cut 1.8 km from the planned length.

26 km

Corridor mapped

1.8 km

Shorter route

400 m

Route shift

We changed the route before we ordered the pipe, which is the only cheap time to do it.

Subsea engineering manager, Halcrest Energy

NEXT DIVE

Plan your first survey without booking a ship.

Send the site, the depth and what you need to see. A survey planner replies within one working day with a lane plan and a fixed price.

LIVE14 VEHICLES AT SEA · 3 DOCKED · 41,208 KM FLOWN THIS YEAR

Create a free website with Framer, the website builder loved by startups, designers and agencies.