MISSIONS
One vehicle, four kinds of work.
Swap the payload and the mission plan, not the vehicle. The same K6 inspects pipelines on Monday and maps wind-farm scour on Friday.

Pipeline inspection
Fly 40 km of export line in a single dive. K6 tracks the pipe, measures burial depth and flags every free span longer than 2 m.
40 km per dive
Scour surveys
Map the rock armour around each monopile and see where the current has dug in, turbine by turbine, without a vessel on site.
60 foundations a week
Seep monitoring
Revisit the same methane seeps every month and log plume height, flow and sediment change against a fixed baseline.
±5 cm repeatability
Debris and lost cargo
Search a box of seabed lane by lane, classify contacts on board and send back positions the recovery crew can trust.
12 km² per day— THE FLEET
Vehicles, a dock and the software that runs them.

Survey AUV
6,000 m
K6 Survey
The hover-capable workhorse.

Inshore AUV
300 m
K3 Inshore
Harbours, rivers and the first 300 metres.

Hover AUV
3,000 m
K6 Intervention
Light work, no tether.

Seabed dock
3,000 m
Lantern Dock
A garage on the seabed.

Fleet software
—
Tidewire
One pilot, six vehicles.

Sensor payload
6,000 m
Ridgeline Payload
Survey-grade sonar in one bay.
THE VEHICLE
Six modules. One afternoon to swap a payload.
Every K6 section is a sealed, pressure-rated module with the same wet-mate connectors. Change the payload bay for a laser scanner or a water sampler on the quayside, not in a factory.
- 01PropulsionGuarded 1.2 kW ducted thruster · X-tail · 4 anodes
- 02Energy24 kWh pressure-tolerant Li-ion · 72 h at 3 kn
- 03NavigationFibre-optic INS · Iridium + GPS mast · strobe
- 04Payload bay400 kHz multibeam · 900 kHz side-scan staves
- 05Hover4 guarded tunnel thrusters · 600 kHz DVL
- 06Vision4K stereo camera · 8 × 2,500 lm LED ring
IMAGING
At 1,240 metres the camera sees blue. The report shows rust.
Water eats red light within metres. K6 lights the scene itself, then corrects every frame on board using the measured distance to the seabed, so inspectors read coating damage in true colour.
- 01Distance-aware colour model
- 023 s per frame on the vehicle
- 03Stereo depth for every pixel


IN NUMBERS
Built to replace the ship, not the crew.
01Depth rating
0 m
Covers 98% of the world's seabed
02Endurance
0 h
At 3 knots with the full sensor suite on
03Mapped per day
0 km²
At 5 cm resolution, 12 m above the floor
04Cheaper than a ship day
0 %
Average saving across 2025 client programmes
DELIVERABLES
What lands in your inbox after a dive.

| ID | Event | Size | Severity | Position |
|---|---|---|---|---|
| E-041 | Free span | 6.4 m × 0.9 m | High | KP 12.310 |
| E-042 | Gas seep | Plume 11 m | High | KP 12.884 |
| E-043 | Debris | Container 6 m | Medium | KP 13.052 |
| E-044 | Coating damage | 0.3 m² | Medium | KP 13.410 |
| E-045 | Burial < 0.5 m | 38 m length | Low | KP 14.002 |
OPERATIONS
Fourteen vehicles at work on four continents.
Every K6 reports to the Aberdeen operations room over Iridium when it surfaces. One pilot supervises up to six vehicles; the rest of the team plans the next dive.
- Aberdeen operations room57.15°, -2.10°
- Line 7 export pipeline Norwegian Sea3 K6 · surveying
- Hornsea scour campaign North Sea2 K6 · on dock
- Baltic power cable Baltic Sea1 K6 · transit
- Deepwater tieback Gulf of Mexico2 K6 · surveying
- Pre-salt risers Santos Basin2 K6 · surveying
- Seep baseline Gulf of Guinea1 K6 · monthly
- Changhua wind farm Taiwan Strait2 K6 · surveying
- Bass Strait cable Bass Strait1 K6 · planning
— CASE STUDIES
Surveys our clients used to book a ship for.
Oil & gas
Norwegian Sea
41 km of export pipeline in a single dive
Line 7 needed a full integrity survey before winter. One K6 flew it end to end and found the free span a ship survey had missed.
19 h
Vehicle time
0
Vessel days

Offshore wind
North Sea
Sixty monopiles in six days
A scour campaign across a 1.2 GW wind farm, run from a single CTV while turbines kept generating.
60
Foundations
6 days
Campaign

Power cables
Baltic Sea
Burial check on a Baltic power cable
A depth-of-burial survey along an interconnector, flown from shore without a survey vessel.
118 km
Cable surveyed
2.1 km
Low cover found

— CAREERS
Build machines that work where people can’t.
We are 64 engineers, pilots and surveyors in Aberdeen, Bergen and Houston. Most of us have spent time offshore; all of us would rather send a robot.
SEE ALL SIX ROLES ↗
— PLAN A SURVEY
Send us the site. We’ll send back the lane plan.
A survey planner reads every brief. You get a lane plan, a vehicle count and a fixed price within one working day, usually sooner.







