MULTIBEAM SONAR400 kHz · 512 beams
DOPPLER VELOCITY LOGholds position to ±2 cm
TUNNEL THRUSTERS ×4hover, strafe, crab in current
MAIN THRUSTER4 kn cruise · 72 h endurance
STEREO CAMERA4K · 2 × 20,000 lm LEDs
EXPORT PIPELINE 24" 99%
FREE SPAN · 6.4 M 98%
DEBRIS · CONTAINER 94%
GAS SEEP 87%
BOULDER · 1.2 M 81%
K6-03SURVEYING LANE 5
K6-07DISPATCHED · ETA 14 MIN
DOCK · LANTERNCHARGING 2 SLOTS

MISSIONS

One vehicle, four kinds of work.

Swap the payload and the mission plan, not the vehicle. The same K6 inspects pipelines on Monday and maps wind-farm scour on Friday.

THE VEHICLE

Six modules. One afternoon to swap a payload.

Every K6 section is a sealed, pressure-rated module with the same wet-mate connectors. Change the payload bay for a laser scanner or a water sampler on the quayside, not in a factory.

  1. 01PropulsionGuarded 1.2 kW ducted thruster · X-tail · 4 anodes
  2. 02Energy24 kWh pressure-tolerant Li-ion · 72 h at 3 kn
  3. 03NavigationFibre-optic INS · Iridium + GPS mast · strobe
  4. 04Payload bay400 kHz multibeam · 900 kHz side-scan staves
  5. 05Hover4 guarded tunnel thrusters · 600 kHz DVL
  6. 06Vision4K stereo camera · 8 × 2,500 lm LED ring

IMAGING

At 1,240 metres the camera sees blue. The report shows rust.

Water eats red light within metres. K6 lights the scene itself, then corrects every frame on board using the measured distance to the seabed, so inspectors read coating damage in true colour.

  • 01Distance-aware colour model
  • 023 s per frame on the vehicle
  • 03Stereo depth for every pixel
The same frame after on-board colour correction
Raw camera frame at 1,240 m: blue-green and low contrast
RAW · 1,240 MCORRECTED ON BOARD

IN NUMBERS

Built to replace the ship, not the crew.

01Depth rating

0 m

Covers 98% of the world's seabed

02Endurance

0 h

At 3 knots with the full sensor suite on

03Mapped per day

0 km²

At 5 cm resolution, 12 m above the floor

04Cheaper than a ship day

0 %

Average saving across 2025 client programmes

DELIVERABLES

What lands in your inbox after a dive.

Bathymetry map with depth contours
−2,431 M−2,389 M
PORT 75 MSTBD 75 M
Inspection report · Line 7 export pipelineDive 0317-A · 2026-09-14 · 41.2 km
5events
2high
+1since last pass
IDEventSizeSeverityPosition
E-041Free span6.4 m × 0.9 mHighKP 12.310
E-042Gas seepPlume 11 mHighKP 12.884
E-043DebrisContainer 6 mMediumKP 13.052
E-044Coating damage0.3 m²MediumKP 13.410
E-045Burial < 0.5 m38 m lengthLowKP 14.002

OPERATIONS

Fourteen vehicles at work on four continents.

Every K6 reports to the Aberdeen operations room over Iridium when it surfaces. One pilot supervises up to six vehicles; the rest of the team plans the next dive.

  • Aberdeen operations room57.15°, -2.10°
  • Line 7 export pipeline Norwegian Sea3 K6 · surveying
  • Hornsea scour campaign North Sea2 K6 · on dock
  • Baltic power cable Baltic Sea1 K6 · transit
  • Deepwater tieback Gulf of Mexico2 K6 · surveying
  • Pre-salt risers Santos Basin2 K6 · surveying
  • Seep baseline Gulf of Guinea1 K6 · monthly
  • Changhua wind farm Taiwan Strait2 K6 · surveying
  • Bass Strait cable Bass Strait1 K6 · planning
DRAG TO ROTATE

— CAREERS

Build machines that work where people can’t.

We are 64 engineers, pilots and surveyors in Aberdeen, Bergen and Houston. Most of us have spent time offshore; all of us would rather send a robot.

SEE ALL SIX ROLES ↗

— PLAN A SURVEY

Send us the site. We’ll send back the lane plan.

A survey planner reads every brief. You get a lane plan, a vehicle count and a fixed price within one working day, usually sooner.

SURVEY PLANNING

VEHICLE SALES

OPERATIONS ROOM

Staffed 24/7 · Aberdeen

LIVE14 VEHICLES AT SEA · 3 DOCKED · 41,208 KM FLOWN THIS YEAR

Create a free website with Framer, the website builder loved by startups, designers and agencies.